Bothell City Hall, WA, USA

2019-02-03T18:16:33-08:00

This project consists of a new 3 story, 92,000 square foot below grade parking garage with a 54,000 square foot, four floor office building and an attached 6,200 square foot Council Chambers building.

  • 11,600 SF of precast wall panels
  • Galvanized Reinforcing Steel
  • Dayton Lifting Anchors
  • Embeds and connections to Precast Panels, columns and Slab Edge
  • Project Site: 18415 101st Avenue NE, Bothell, WA

Bridge, Philip Ave. N. Vancouver, Canada

2018-11-11T18:36:25-08:00

Bridge, Philip Ave. North Vancouver

The project included the design and casting of prestressed steel-cables for I Girder. The Philip Avenue Overpass was upgraded to minimize road and rail conflicts and reduce traffic congestion in the area.
Project Value: $32M

Project partners include Transport Canada, the Province of British Columbia, the District of North Vancouver, CN Rail, and Kinder Morgan Terminals.

Evergreen Line, Port Moody. BC. Canada

2018-11-11T18:35:25-08:00

EVERGREEN LINE RAPID TRANSIT PROJECT

Construction for the Evergreen Line Project includes a two-kilometre bored tunnel with tunnel portals located in Port Moody and Coquitlam.
SB\Eng. has developed high performance concrete with polypropylene fiber, steel fiber, and normal reinforcement deformed bar and designed the tunnel with low-permeability & high strength concrete.