Project Description

EVERGREEN LINE RAPID TRANSIT PROJECT

Construction for the Evergreen Line Project includes a two-kilometre bored tunnel with tunnel portals located in Port Moody and Coquitlam.
SB\Eng. has developed high performance concrete with polypropylene fiber, steel fiber, and normal reinforcement deformed bar and designed the tunnel with low-permeability & high strength concrete.